The client who has 17 different manufacturing lines for performing the different operations. The operators work in the different shifts, some works as Inside operator and some as outside operator depending on their competencies the Manager schedules the operators. The schedule is updated on the daily basis. Each machine has target quantity per day and for that quantity the number of operators is decided, as per the target quantity the job is allocated to the operator and carry it forward on the next day for remaining quantity.